Saturday, October 27, 2012

Growing panes...

As we prepare to greet Sandy (Hurricane S), we are glad the boys were able to get the windows in and just about all of the sheathing on (hoping it stays on in tomorrow's winds).  So here are some photos of how she looked last Friday, and crossing fingers that she'll not look to much the worse for wear after the hurricane.  I'm guessing we'll at least be picking Tyvek out of the woods for a while.

*****

Windows are set.  They are Pella Architect series, double-hung, aluminum clad exterior and unfinished pine interior, cross-hair grid in the upper pane, and no grid in the lower pane.

*****


Jenny, checking out the window tilt-in cleaning function, but apparently she doesn't DO windows, haha! (oops, I'm in trouble...)  This is the master bdrm.

*****


Looking into the master bath from the master bdrm.  Sinks will be on the left, toilet, shower and bathtub around to the right.

*****


Round window in the shower & tub area.

*****


Living room, windows by the fireplace.

*****


Living room and dining area windows, just as we pictured them and the view they give (there is still opaque protective wrap on the windows so no view yet).

*****


Square casement window in the mudroom.  The exterior door will lead to the screened in porch.

*****


Frame-up of the kitchen pantry closet.  When you look at the door heights, you get a feel for how tall the 10 ft ceilings really are.  Donna Lebo Monger and I would be challenged by these ceilings, not to mention getting onto her shoulders in the first place.

******

View from the back.  Matt provided me the basement door sizes so now I can start fabricating these to close off the basement.  Rough-in of plumbing and HVAC will start next week after Sandy skips town.


Friday, October 19, 2012

The shape of things...

Big rain last night...but head back, chest out, hands on hips, I laughed in haughty imperviousness, knowing our roof was on and the house framing was kept dry (mostly).  The past week has seen the full roof in place, the side extension framed & sheathed, the chimney framed, and the interior walls built out.   The windows arrived on site and will probably be set next week.

*****


A misty morning after the rains, notice he chimney built out and the extension peaking at right.

*****


View from kitchen toward living room, fireplace/wood stove opening is forming up with the chimney sheathing behind, some wall sheathing still missing (a bit irksome).  We plan to leave the center beam exposed. Thinking to put a built-in reading bench under the window to the right of the fireplace.

*****

A better view of the side extension.  The front window belongs to the 1st floor guest bathroom.  The side door leads into the mudroom & laundry room, where the powder room is also located.  The window above the side extension roof belongs to the 2nd guest bedroom on the upper floor.  Imagine if you will, a continuation of the extension to the right for the attached screened-in porch.

*****

View from the front, I really like how Matt's crew extended the chimney up so you can see it from this vantage point (peaking just over the roof at left).

*****

Autumn view out one of the master bedroom windows.  Windows will eventually constrict this view, but today I spent about 10 minutes there watching, well... serenity, calm, peacefulness.  After a while a flock of ravens flew over cawing madly heading for the corn fields on the farm across the creek, a hawk then glided over their way a bit later, screeching for them to be quiet.

*****

And this gives you an idea of what you will see as you drive up to the house, a touch of Autumn color. There will be a gravel driveway approaching the extension, entering into a gravel circle in front of the house, and then another gravel drive leaving the circle from the left side of the house joining back into the existing drive at this point of view.

****

Next up, windows on our small (but all we need) world...




Wednesday, October 10, 2012

Gimme shelter!

Sorry for a bit of time since last post.  We had steady, but slower, progress over the past couple of weeks as our two carpenters were abandoned by their helpers, apparently our fairly steep 12/12 pitch roof scared them off.  But Matt and the carpenters moved forward with some Herculean lifts of beams, rafters and sheathing, so now we are under roof for the main house.  Matt tells me they are working on framing up the remaining gable-end and interior walls this week, will be down on Friday to have a look.  Want to get the west extension framed up and under roof as soon as possible as the deck has been in several rain storms already.  Matt is starting to bring in the utility trades to scope out the project as the framing wraps up.  Want to thank my Dad for joining me on several trips down to check on the work!  It's always more fun to visit with someone to bounce views off of, and he's had some great recommendations that will make the house better!

*****


The view a week ago, Jose just starting the roof sheathing after fitting the ridge beam and rafters.

*****

View from the west.

*****

Each corner of the second floor will have this sloping roof feature, which we love.  This is the second floor guest room looking north.

*****

Roof on! Mostly.  Now we can visualize the house outline, though the west (right) extension (behind the dumpster) is not framed and roofed yet, nor the chimney on the left side.

*****

From the direct front.  You can tell by the ladder that the stairs are not yet in place, but Matt has them on order.

*****

*Disclaimer: Not our view*  Had dinner with my Dad and Jenny at Patowmack Farm in Loudoun County, Virginia, an organic farm and restaurant near Point of Rocks, Maryland.  The near trees are Virginia and the far, sunny trees are Maryland, the Potomac River runs under the bridge.  I recommend it for a special, "out of the ordinary" dining experience, but its far from home and don't blame me for the bill!  Support local agriculture!

*****
Next up, considering modern conveniences...